§ Deadline

DARPA · SBIR · Phase II

Novel Radio Frequency Sensing Technologies

DARPA posted this SBIR topic. It takes Phase II proposals until October 21, 2026.

Topic
DPA26BZ06-DV023
Call
DoW SBIR 2026 BAA
Agency
Department of Defense, DARPA
How we got this date

We read this date from the DoD SBIR/STTR topic site. We last checked it on October 1, 2026.

We check it again each day. If the agency moves the date, this page moves with it.

The listing is the final word. Read it before you apply.

From the topic

Develop, integrate, and flight-test a high-altitude (=40,000 ft), high-speed (~400 knots) airborne geologic sensing system. The system must be capable of providing rapid, stand-off 3D subsurface tomographic imaging to detect subterranean features such as metals and critical minerals.

Objective, as posted by the agency
What Phasegate does

Track this date, and find the next one.

  • Phasegate reads your award record for you.
  • It shows which open topics you can apply for.
  • It tracks each close date and warns you well before it.
  • It starts your Commercialization Plan as a draft.

Pursue

$1,188 a year

or $199 a month. Thirty days, money back.

Not the agency

Phasegate is a private service. We are not the agency that posted this topic. We do not take or send bids. To apply, use the agency site.