DARPA · SBIR · Phase II
Novel Radio Frequency Sensing Technologies
DARPA posted this SBIR topic. It takes Phase II proposals until October 21, 2026.
- Topic
- DPA26BZ06-DV023
- Call
- DoW SBIR 2026 BAA
- Agency
- Department of Defense, DARPA
We read this date from the DoD SBIR/STTR topic site. We last checked it on October 1, 2026.
We check it again each day. If the agency moves the date, this page moves with it.
The listing is the final word. Read it before you apply.
Open the listing on dodsbirsttr.mil Where all our data comes from
Develop, integrate, and flight-test a high-altitude (=40,000 ft), high-speed (~400 knots) airborne geologic sensing system. The system must be capable of providing rapid, stand-off 3D subsurface tomographic imaging to detect subterranean features such as metals and critical minerals.
Track this date, and find the next one.
- Phasegate reads your award record for you.
- It shows which open topics you can apply for.
- It tracks each close date and warns you well before it.
- It starts your Commercialization Plan as a draft.
Pursue
$1,188 a year
or $199 a month. Thirty days, money back.
Phasegate is a private service. We are not the agency that posted this topic. We do not take or send bids. To apply, use the agency site.