§ Deadline

Air Force · SBIR · Phase II

Low SWaP-C Tactical Awareness Payload for Proliferated, Agile Satellites (TAPPAS) for Space Domain Awareness

The Air Force posted this SBIR topic. It takes Phase II proposals until October 21, 2026.

Topic
DAF26BX06-DV511
Call
DoW SBIR 2026 CSO
Agency
Department of Defense, Air Force
How we got this date

We read this date from the DoD SBIR/STTR topic site. We last checked it on October 1, 2026.

We check it again each day. If the agency moves the date, this page moves with it.

The listing is the final word. Read it before you apply.

From the topic

The objective of this Direct to Phase II (D2P2) effort is to provide a production representative article of flight qualifiable hardware to be flown in the GEO space environment. The modern space domain requires a layered sensing architecture to ensure resilience.

Objective, as posted by the agency
What Phasegate does

Track this date, and find the next one.

  • Phasegate reads your award record for you.
  • It shows which open topics you can apply for.
  • It tracks each close date and warns you well before it.
  • It starts your Commercialization Plan as a draft.

Pursue

$1,188 a year

or $199 a month. Thirty days, money back.

Not the agency

Phasegate is a private service. We are not the agency that posted this topic. We do not take or send bids. To apply, use the agency site.